Draw the building outline and place the down conductors. Get the ring length, joints and resistance.

CalculatorTechnical drawingMethod: R = 0.6·ρ/√A (DEHN, table 5.5.1) · BS 7430Built for an earthing systems manufacturer: case study
OUTLINE AND MATERIALS

Your ring earth plan

Choose an outline or draw one on the grid. You can change the dimensions with the mouse or in the fields.

Foundation slab
Slab reinforcement in contact with the soil acts as a foundation earth electrode. The calculator covers only the ring and vertical rods.
Corners first, because lightning protection down conductors run there. Any extra leads go on the longest walls.
In addition to the section between the ring earth and the wall. Include the vertical run and the route to the clamp.
Edit corners
TOP VIEW / 1 m GRID

Building outline and ring earth

Drag a corner. Click a wall to change its length.

4 points
X1 · 16.0 mY1 · 12.0 mX2 · 16.0 mY2 · 12.0 mL1L2L3L4P1P2P3P4
Building Ring earth Connection lead Vertical rod

Wall dimensions

X marks horizontal walls in the drawing, Y vertical ones, S slanted ones. Type a length and press Enter: the wall end and the next corner move along it.

  • m
  • m
  • m
  • m
RING EARTH, THEN VERTICAL RODS

Earth resistance

Non-insulated slab
Don’t know the soil resistivity? Measure it with the Wenner method (step 2)
On the ring earth, corners first, next to the leads.
The forged rod is made of 1.5 m sections, at most 4.5 m.
10 Ω: example from EN IEC 62305-3. The designer sets the requirement.
RING WITH RODS: RANGE
2.6–3.8 Ω
The ring earth alone meets 10.0 Ω
Ring earth3.78 ΩRods 4 × 3.0 m8.53 ΩArea inside the ring252.0 m² · re 9.0 m
  • Range: from an ideal parallel connection (2.62 Ω) to the ring alone (3.78 Ω). The rods interact with each other and with the ring, so the result lies above the lower bound.
  • Smallest rod spacing: 14.0 m. BS 7430 recommends at least twice the depth (6.0 m).
  • Slab reinforcement is not included in the resistance, so the result is conservative.
TAPE INCLUDING RESERVE
85.4 m
Quantities from geometry
Ring earth length64.0 mConnection leads13.7 mOutline area192.0 m²
i

Quantity plan: the ring earth is an offset of the outline sides with square corners. The joint count assumes full roll lengths in a closed loop and one connection per connection lead. Resistance is an estimate for uniform soil: ring R = 0.6·ρ/√A (consistent with DEHN, tab. 5.5.1), vertical rod per BS 7430. Cutting plan, additional joints, material selection and soil conditions must be checked in the design, and the resistance must be confirmed by measurement. The tool does not confirm compliance with standards.

RING EARTH CALCULATOR · PLAN AND RESISTANCE

Ring earth plan: non-insulated slab

Date
Resistance: ring with rods2.6–3.8 ΩRing earth: 3.78 Ω · rods 4 × 3.0 m: 8.53 ΩThe ring earth alone meets 10.0 Ω
Foundation slab
not insulated
Building outline
192.0 m² · 56.0 m
Ring earth
64.0 m · A = 252.0 m²
Distance from building
1.0 m
Tape
30 × 4 mm · 85.4 m
Connection leads
4 pcs · +2.0 m
Soil resistivity ρ
100.0 Ω·m
Vertical rods
4 × 3.0 m · Ø 14.2 mm
Top view1 m grid · ring earth 1.0 m from the building wall · building wall dimensions
X1 · 16.0 mY1 · 12.0 mX2 · 16.0 mY2 · 12.0 mL1L2L3L4
Building Ring earth Connection lead (L) Vertical rod

ROT = 0,6 · ρ / √A (DEHN Lightning Protection Guide, tab. 5.5.1) · Rr = ρ / (2πL) · [ln(8L/d) − 1] (BS 7430:2011, cl. 9.5.3, d = 14.2 mm) · range from 1 / (1/ROT + n/Rr) to ROT, because the interaction of the ring and rods is not calculated.

Slab reinforcement is not included in the resistance. Preliminary calculation for uniform soil; the result must be checked in the design and by measurement after installation. Schematic drawing, dimensions come from the parameters.

Bill of materials

Quantities are a geometric suggestion; cutting plan, joints and fittings are agreed in the design. The designer enters prices from the distributor’s offer.

ItemCatalogue no.QuantityPrice / unit [PLN]Value [PLN]
Tape 30 × 4 mm3 × 30 m = 90.0 m
Ring earth and connection lead joints7 pcs
Forged earth rod 14.2 mm / 1.5 m8 pcs
Rod to ring earth clamp4 pcs
No complete price
NEXT STEP 2 OF 3

Soil resistivity by the Wenner method

Enter the meter readings, compare apparent resistivity and carry the result into the earthing calculation.

Go to step 2